Starter Vape Kit sample cost and refund entry level
A starter vape kit programme only works when three numbers agree: your shelf price, your reorder cycle and your defect tolerance. Change one and the plan moves. We build assortments around those three and we say so up front rather than after the invoice.
Published 17 March 2026 · VapeWholesaleHub · Reading time 7 min
The checks behind every shipment
We work with former smokers who order between a few hundred and a few thousand units at a time, and we treat both ends the same way: a written specification, a sample you approve, and a production run that matches the sample.
We photograph the packing station during production for volume orders. It is a small thing, but it settles most arguments about what was actually in the carton before it was sealed.
Leak complaints almost always trace back to one of three things: an over-torqued centre post, a seal that sat in a hot container, or a fill volume pushed past the design limit. We cap fill volume slightly below maximum for exactly that reason.
Simple habits that lift velocity
Counter space is finite. Three well-chosen SKUs outsell nine crowded ones, and the empty space signals a curated range rather than a clearance table.
Bundle a device with a consumable and the reorder rhythm changes from occasional to weekly. That single merchandising decision often does more for monthly revenue than a price promotion.
Lead times, freight and landed cost
For repeat buyers we hold a shipping schedule rather than shipping on request. A fixed weekly cut-off means your reorder lands before the shelf empties instead of after.
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 12 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
- Consolidated or split shipping, quoted both ways
- Batch codes traceable from carton back to production date
- Document pack prepared per destination market
- Mixed SKU cartons to spread first-order risk
- Standing reorder schedule with a fixed cut-off
- Artwork proof plus physical dummy for custom packaging
After-sales, replacements and reorders
Reorders are the real test of a supplier. If the second shipment does not match the first, the relationship is over regardless of price, so we treat the reorder as the actual deliverable.
Returns are handled as data, not as complaints. Every reported failure is logged by mode and by batch, and the pattern is reviewed monthly with the factory.
Specification summary
| Battery | 350 mAh |
| Pod capacity | 2.0 ml |
| Coil resistance | 0.8 ohm |
| Included | Device, 2 pods, cable |
| Charging | USB-C 5V/1A |
| Packaging | Blister pack |
| Minimum order | 200 units per SKU, mixed cartons allowed |
| Lead time | 12 working days after artwork approval |
If any of this is unclear, the fastest route is a message rather than a meeting. Send the market you sell into and the price band you work in, and you will get a specific answer instead of a brochure.
Frequently asked
What documents come with a shipment?
Commercial invoice, packing list, and the certificate pack for your market: test reports, declaration of conformity and safety data sheets. We send scans before dispatch so your broker can pre-clear the file.
How long does production take?
Around 12 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz