Starter Vape Kit spare kit timeline
If you are comparing three quotes for starter vape kit, compare the paperwork first. Test reports, artwork files, batch coding and the replacement clause tell you more about a supplier than the unit price on page one.
Published 22 March 2025 · VapeWholesaleHub · Reading time 5 min
Getting the documents right
There is no shortage of suppliers quoting starter vape kit. The scarce thing is a supplier who will tell you which SKU to drop. We have been shipping starter vape kits long enough to know that the honest answer is usually a shorter list, and that is the answer we give.
If you sell into a market that requires child-resistant packaging, say so at quotation stage. Retrofitting a CR closure onto a finished bottle design usually means a new mould and a four week delay.
Advertising rules are stricter than product rules in most markets. Claims about cessation, health or comparative performance should stay off packaging and off your product pages unless your legal team has signed them off.
Quality control, in plain terms
A 0.5 percent defect rate sounds excellent until it lands on a 600 unit order and you are handling three returns in a week. We quote realistic rates per category and we credit in advance for the known failure modes.
Flavour drift between batches is the quiet killer of repeat orders. We retain a sealed reference sample from every run so a complaint six weeks later can be compared against what actually left the building.
Unit price versus landed cost
Currency moves more than most buyers expect over a twelve month supply plan. We quote in USD and hold the price for 30 days from confirmation so your margin calculation is not guesswork.
Payment terms for new accounts are normally a deposit with the balance against the bill of lading. Established buyers on a repeat schedule can move to terms after three clean shipments.
- Batch codes traceable from carton back to production date
- Specification locked in writing before production starts
- Document pack prepared per destination market
- Private label files archived for future rebrands
- Standing reorder schedule with a fixed cut-off
- Mixed SKU cartons to spread first-order risk
Getting the carton there intact
We ship from Shenzhen and Guangzhou: air express for samples and part loads, sea freight for volume. Typical production lead time is 12 working days after artwork approval, plus transit. We quote both routes so you can see the trade-off instead of guessing at it.
Transit times move with the season. Book space early for Q4 and around Chinese New Year, when factory output pauses for two to three weeks and freight rates tighten at the same time.
Specification summary
| Battery | 800 mAh |
| Pod capacity | 2.5 ml |
| Coil resistance | 1.0 ohm |
| Included | Device, pod, cable |
| Charging | USB-C 5V/1A |
| Packaging | Blister pack |
| Minimum order | 200 units per SKU, mixed cartons allowed |
| Lead time | 25 working days after artwork approval |
None of this is complicated. It is just written down, which is more than most buyers get before they wire a deposit.
Frequently asked
What is the minimum order for starter vape kit?
Standard configurations start at 50 units per SKU, with mixed SKUs allowed inside the same carton. Custom colours, custom packaging or a private label run usually start at 200 units because of setup time on the line.
How long does production take?
Around 12 working days after artwork approval for stock configurations, plus transit. Custom runs add roughly a week for tooling and a physical dummy. We confirm the date in writing on the order acknowledgement.
Can you ship to multiple locations?
Yes. Split shipments are quoted separately because consolidation and splitting price differently. Tell us the destination list at quotation stage and we will show both options.
Related reading
Need a quotation on starter vape kits?
Send destination market, target price and quantity. Same-day reply on working days.
Tel / WeChat / WhatsApp +86 13711127975 · vape@0099933.xyz